
Tentech FLNG
Year: 2009
Client: Aker Solution
Description
Development of a generic FLNG hull with prismatic/ADBT LNG tank.
BE SOW
- Hull lines, lay-out and structure with internal turret.
- Design of the LNG containment system by applying of ADBT LNG tank 50.000 m3.
- Hull tank integration and interface, with respect to vessel motions and structural integrity