Gas FPSO
February 15, 2019
Navion Saga FSU-Redeployment
February 15, 2019

SM1650

Year: 2014-15

Field: Generic

Shelf state: Brazil

Client: Nov

Man-hours: 12 000

Scope: Concept development and basic design

Description

Design and basic engineering for a new built generic spread moored FPSO. Storage capacity is 1,65 mmbl, topside 27 000 t. The FPSO was developed as an alternative to converted VLCC for the Libra oil field, however it is suitable for the whole Brazilian continental shelf. BE was responsible for all design and engineering including outline topside lay out.

Related Projects