CO2 Green Tanker
May 13, 2009
LNG FSRU Toscana – (EPCI, FEED study)
May 13, 2006

LNG Cargo tank

Year: 2008-2009

Project principal: Aker Solution – Wadan Yards LNG Technology

Description

Partner to Aker in development of ADBT LNG carrier (IMO A-tank), suitable both as a ship cargo tank (13.000 m3 ) and for FLNG ( 200.000 m3  )

SOW

  • Discipline lead – structure / analysis
  • Development /concept engineering
  • Strength analysis of tank / ship hull
  • Hydrodynamic / Weight analysis
  • Fatigue analysis / Crack propagation
  • Support of tank
  • Detailed drawings for class approval

Related Projects