
Knarr FPSO (Jordbær Field Development)
Year (LPP): 2010-15
Field: Jordbær
Shelf state: Norway
Client: BG Norge AS
Man-hours: 12 000
Scope: Pre-FEED study. Various verification studies and owners engineer
Description
Turret modification
Verification of modifications of the Turret mooring table to accommodate the increased riser loads. 3rd party verification study
Structural analysis based FEM. Verification of Samsung HHI FEED with special attention to design of fatigue critical details exposed to harsh environment wave loading. Extensive stochastic fatigue analysis
Hydrate remediation study
Compilation and review of the hydrate remediation strategies. The study included a review of the fluid composition and the development of a hydrate remediation strategy
Pre-FEED study
Pre-FEED study for development of FPSO for the Jordbær Field. Works include all disciplines, naval architecture and stability, hull and structural design, marine and utility systems, living quarter design, safety design. Weight and cost estimates and input to overall field development plan developed