Cash FLNG

Year: 2010-11

Field: Cash / Maple

Shelf state: Australia

Client: PTTEPy

Man-hours: 9 000

Scope: Pre-FEED Study

Description

Pre-Feed study for a complete FLNG, including PFDs & heat and mass balances, layout and piping studies, turret and mooring specification, LNG storage tank selection, hull design, offloading system design, marine & utility systems, material handling, modularisation & topsides integration studies, preparation of Design Basis, preliminary Design Philosophies, constructability review/shipyard visits, cost estimate, project execution plan.

Due diligence for three FLNG concepts for the Cash Maple field.