
Banyu Urip
Year (LPP): 2011-13
Field: Banyu Urip
Shelf state: Indonesia
Client: Sembawang Shipyard
Man-hours: 20 000
Scope: Basic design for conversion
Description
Conversion of a 1993 built VLCC into a floating storage and offloading unit. Input to the project is a concept study performed in 2010. The project involved all basic design activities involved in complete class package to ABS. All disciplines are covered, i.e. Naval Architecture, Structure, Marine Systems, EIT and Technical Safety