IchthysFPSO

Foto: Inpex
  • Period: Year: 2009-2011
  • Client: Aker Solutions Inpex
  • Area of operation: Australia
  • Work load: 35 000
  • Regulations/class: Australia
  • Disciplines:

    Structural design ,

    Machinery and System ,

    Layout, cross discipline ,

    Electrical power systems ,

    HVAC ,

    Hydro dynamics and static ,

    Process

Level of Engineering Basic Engineering

The Ichtys FPSO is a faciltiy for treatment of condensate from the Ichtys gas field. The facilty has an utra-long desing life of 40 year without going of the field.